小编典典

获取给定日期的正确星期数

c#

我在Google上搜索了很多,找到了很多解决方案,但是没有一个给我正确的2012-12-31周数。甚至MSDN(link)上的示例也失败了。

2012-12-31是星期一,因此应该是第1周,但是我尝试的每种方法都给了我53。这是我尝试过的一些方法:

从MDSN库:

DateTimeFormatInfo dfi = DateTimeFormatInfo.CurrentInfo;
Calendar cal = dfi.Calendar;

return cal.GetWeekOfYear(date, dfi.CalendarWeekRule, dfi.FirstDayOfWeek);

解决方案2:

return new GregorianCalendar(GregorianCalendarTypes.Localized).GetWeekOfYear(date, CalendarWeekRule.FirstFourDayWeek, DayOfWeek.Monday);

解决方案3:

CultureInfo ciCurr = CultureInfo.CurrentCulture;
int weekNum = ciCurr.Calendar.GetWeekOfYear(dtPassed, CalendarWeekRule.FirstFourDayWeek, DayOfWeek.Monday);
return weekNum;

更新资料

当日期为2012-12-31时,以下方法实际上返回1。换句话说,我的问题是我的方法未遵循ISO-8601标准。

// This presumes that weeks start with Monday.
// Week 1 is the 1st week of the year with a Thursday in it.
public static int GetIso8601WeekOfYear(DateTime time)
{
    // Seriously cheat.  If its Monday, Tuesday or Wednesday, then it'll 
    // be the same week# as whatever Thursday, Friday or Saturday are,
    // and we always get those right
    DayOfWeek day = CultureInfo.InvariantCulture.Calendar.GetDayOfWeek(time);
    if (day >= DayOfWeek.Monday && day <= DayOfWeek.Wednesday)
    {
        time = time.AddDays(3);
    }

    // Return the week of our adjusted day
    return CultureInfo.InvariantCulture.Calendar.GetWeekOfYear(time, CalendarWeekRule.FirstFourDayWeek, DayOfWeek.Monday);
}

阅读 365

收藏
2020-05-19

共1个答案

小编典典

如该MSDN页面中所述,ISO8601周和.Net周编号之间存在细微差异。

您可以在MSDN博客中参考本文以获得更好的解释:“ Microsoft .Net中的ISO
8601年度格式

简而言之,.Net允许将数年的时间分成数年,而ISO标准则不允许。在文章中,还有一个简单的函数可以为一年的最后一周获取正确的ISO 8601周编号。

更新 以下方法实际上返回1,2012-12-31在ISO 8601中该值是正确的(例如德国)。

// This presumes that weeks start with Monday.
// Week 1 is the 1st week of the year with a Thursday in it.
public static int GetIso8601WeekOfYear(DateTime time)
{
    // Seriously cheat.  If its Monday, Tuesday or Wednesday, then it'll 
    // be the same week# as whatever Thursday, Friday or Saturday are,
    // and we always get those right
    DayOfWeek day = CultureInfo.InvariantCulture.Calendar.GetDayOfWeek(time);
    if (day >= DayOfWeek.Monday && day <= DayOfWeek.Wednesday)
    {
        time = time.AddDays(3);
    }

    // Return the week of our adjusted day
    return CultureInfo.InvariantCulture.Calendar.GetWeekOfYear(time, CalendarWeekRule.FirstFourDayWeek, DayOfWeek.Monday);
}
2020-05-19